Skip to content
jsmorphPublic

About

Copy of the Lean 4 project listed in https://alpo.ge/remark.pdf

Resources

Stars

46 stars

Watchers

0 watching

Forks

Latest commit

 

History

3 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 

Repository files navigation

rh

Author: Levent Alpöge

This repository holds a copy of a Lean 4 project by Levent Alpöge, distributed as the archive lean.tar.gz in 14 parts. Alpöge's four-page note at https://alpo.ge/remark.pdf lists the parts in its first footnote. In that note, Alpöge reports finding, with Claude, a proof of the Riemann Hypothesis and the Generalized Riemann Hypothesis, and formalizing it in Lean without assumptions. The note's PDF metadata gives a creation date of 2026-11-20.

Provenance

This copy comes from the parts at https://alpo.ge/lean.tar.gz.part01 through https://alpo.ge/lean.tar.gz.part14, downloaded on 2026-11-20 and joined in numeric order. The directory lean/ holds the contents of the joined archive without modification, and the only added files are this README and the image grh-timeline.png. The archive includes no license file.

File Bytes SHA-256
remark.pdf 245,114 3fc97784b71ddd44ff8aa0a177e99622a1c61b13cfa843a0989ee4a7a0cfeb8d
lean.tar.gz (joined) 239,275,554 9631b4f020199e580ba86178cb56c6e9b09f690c2369a80dc4334aa93f49c7fc

Status

Publishing this copy did not include building the project or reading its proofs. The claim of a proof belongs to Alpöge and has not been checked here. The Main library has roots lean/src/Statements.lean and lean/src/Main.lean, which are the places to start an evaluation of what the project states and whether it depends on sorry or added axioms.

Item Value
Lean toolchain leanprover/lean4:v4.33.1
Mathlib commit 0df444a360eaa60ab8c11dca51a86af692955474
Lean source files 175,187
Source size 983 MB

Timeline diagram

Timeline of the 20 entries in the note, with conjectured dependencies

Fable (Claude Fable 5.2, an Anthropic model) created this image from the timeline in section 2 of the note. Horizontal distance is proportional to elapsed days, from 6 October to 16 November 2026. Each numbered node is one timeline entry, numbered as in the note, and the labels are short paraphrases of the entries. Entries with the same date share a vertical line, and their vertical order carries no meaning.

The arrows are Fable's conjectures about which entry uses which. The note states no dependencies, and Alpöge has not reviewed the arrows. Solid blue arrows follow wording in the note that links two entries. Dashed brown arrows are inferences from the mathematics that the entries name, and several are weak. Fable did not read the Lean proofs to make the diagram, so the arrows do not describe the import structure of lean/. The image has two drawing faults: arrows pass under some labels, and the arrows among the entries dated 15 November overlap.

About

Copy of the Lean 4 project listed in https://alpo.ge/remark.pdf

Resources

Stars

46 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages