You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Date consistency check for updates.csv and systemupdates.csv #696
Like the CCC, it's a change on check, so once it's merged it won't be an error any longer. No need for an FP mechanism beyond a note from the commit author saying it was intentional.
I think I'd want it to allow the current date or the day before.
Why day before? The check is executed when submitting the PR. Not on merging.
When the check fails, one minute after submission, I can immediately fix the date.
If one has to fix the route link or description, one can comment the failed check being FP
Quick thoughts on the day before/day of/day after:
if it's off by a day or two it doesn't really matter, the update will still be shown near the top
if it's off by a day or two and flagged as a possible error, the submitter could choose to fix or ignore
we're really looking for places with dates that are way off
I think if it's not too hard to put the day before/after in as passing the check that's great but it's also not a problem if they get flagged and the submitter just needs to take a moment to look and say it's fine as-is.
I investigated why the notification for SVK D1 was missing from my log file. The root cause was that the update entry date was off by one day, and I had submitted an update to my list file in the meantime.
Activity
jteresco commentedon Sep 14, 2026
I like this idea. Hope to give it a try some time soon.
cockroachking commentedon Sep 14, 2026
FPs should be allowed for editing existing entries (correcting spelling, broken links, etc.).
jteresco commentedon Sep 14, 2026
Like the CCC, it's a change on check, so once it's merged it won't be an error any longer. No need for an FP mechanism beyond a note from the commit author saying it was intentional.
I think I'd want it to allow the current date or the day before.
michihdeu commentedon Sep 15, 2026
Why day before? The check is executed when submitting the PR. Not on merging.
When the check fails, one minute after submission, I can immediately fix the date.
If one has to fix the route link or description, one can comment the failed check being FP
michihdeu commentedon Sep 15, 2026
I think that a day ahead should also be fine. Please refer to https://forum.travelmapping.net/index.php?topic=7771.msg43659#msg43659
jteresco commentedon Sep 15, 2026
Quick thoughts on the day before/day of/day after:
I think if it's not too hard to put the day before/after in as passing the check that's great but it's also not a problem if they get flagged and the submitter just needs to take a moment to look and say it's fine as-is.
jteresco commentedon Sep 15, 2026
Should have followed @michihdeu's link, he makes similar points on the forum.
Hopefully I'll find some time to try this out soon. Been a very busy start to my semester.
michihdeu commentedon Oct 7, 2026