You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Make deployer rollback stop and verify the old service before replacement #185
During rollback, the shared deployer should stop a running workload and confirm it has exited before starting its replacement when the two must not overlap (for example, a scheduler or singleton worker). This belongs in the deployer, not in separate app scripts. Builds on #22; don't broaden the current production support or approval boundary.
Acceptance
Request graceful shutdown and wait within a bounded, documented timeout. Scope stops to the exact managed target and services; leave unrelated services and persistent state alone.
Verify the old workload has exited before starting its replacement from the previously approved immutable artifact. If the stop times out or exit cannot be verified, report the target, service and reason, leave the operation in an explicit safe state, and do not start a second instance. Any authorized escalation must be explicit and accounted for, never a silent success.
Verify rollback health and record the resulting artifact identity. A repeated or interrupted operation must not start a duplicate workload.
Prove the normal path and a deliberately stuck stop on an isolated non-production target. Publish the supported core version and adapter/config expectations so downstream repos can adopt it without copying the rollback logic.
Activity