Skip to content

Stable 26.8 Backport of #126138 - Revert "Revert "Verify the server certificate hostname on outbound TLS connections"" - #2670

Merged
zvonand merged 1 commit into
stable-26.8from
backports/stable-26.8/126138
Oct 25, 2026
Merged

zvonand merged 1 commit into
stable-26.8from
backports/stable-26.8/126138

Conversation

@zvonand

@zvonand zvonand commented Oct 25, 2026

Copy link
Copy Markdown
Member

Changelog category (leave one):

  • Not for changelog (changelog entry is not required)

Changelog entry (a user-readable short description of the changes that goes to CHANGELOG.md):

...

Documentation entry for user-facing changes

...

CI/CD Options

Exclude tests:

  • Fast test
  • Integration Tests
  • Stateless tests
  • Stateful tests
  • Unit tests
  • Performance tests
  • Aarch64 tests
  • All with ASAN
  • All with TSAN
  • All with MSAN
  • All with UBSAN
  • All with Coverage
  • All Regression
  • Disable CI Cache

Regression jobs to run:

  • Fast suites (mostly <1h)
  • Aggregate Functions (2h)
  • Alter (1.5h)
  • Benchmark (30m)
  • CAS (content-addressed storage; Antalya only)
  • ClickHouse Keeper (1h)
  • Iceberg (2h)
  • LDAP (1h)
  • OAuth (5m)
  • Parquet (1.5h)
  • RBAC (1.5h)
  • SSL Server (1h)
  • S3 (2h)
  • S3 Export (2h)
  • Swarms (30m)
  • Tiered Storage (2h)

…michev/revert-116724

Revert "Revert "Verify the server certificate hostname on outbound TLS connections""
@github-actions

Copy link
Copy Markdown

Workflow [PR], commit [554ce84]

@zvonand zvonand added the 26.8 label Oct 25, 2026
@zvonand

zvonand commented Oct 25, 2026

Copy link
Copy Markdown
Member Author

@blau-ai

@blau-ai

blau-ai commented Oct 25, 2026

Copy link
Copy Markdown
Collaborator

CI triage — 3 red checks, 0 caused by the backported code

Check Verdict
DCO ❌ Process gate — commit lacks a Signed-off-by trailer (expected for an upstream backport). Not a code issue.
Parser memory check ❌ Infra — baseline master binary artifact was missing. Not PR-caused.
PR ❌ Aggregate gate — red only because the two above are red. No independent failure.

Everything that actually exercises the change is green: all enabled builds (amd debug/asan_ubsan/binary/release, arm_release, wasm), Fast test, Quick functional, Stateless (amd_debug parallel/sequential + distributed-plan/s3), Integration (amd_asan_ubsan db-disk old-analyzer 1–8/8), Unit, Stress, AST fuzzer, BuzzHouse, Compatibility, Install packages, Docker images, Grype, SQLLogic/SQLStorm/PromQL. So the revert-of-revert itself is healthy on this branch.


1. DCO — not PR code, easy to clear

cncf/dco2 output: "No sign-off was found in the commit message … All commits are incorrectly signed off."

The single head commit 554ce84 ("Merge pull request ClickHouse#126138 … Revert "Revert "Verify the server certificate hostname…""", author Alexey Milovidov) carries no Signed-off-by: line — normal for a cherry-picked upstream merge commit. Nothing is wrong with the diff; DCO only inspects the commit trailer.

Fix (requires rewriting the single commit — a force-push, so this is on you, not me):

git commit --amend --signoff
git push --force-with-lease origin backports/stable-26.8/126138

Or, if you'd rather avoid a force-push, add a DCO remediation commit (cncf/dco2 "Option 1") on top of the branch — it clears the check without rewriting history.

2. Parser memory check — infra, safe to re-run

praktika report nested result:

ERROR  Resolve master binary
       No master `clickhouse-examples` artifact was found

The job compares parser memory against a master/baseline clickhouse-examples binary and errored before running because that baseline artifact wasn't published for it to download — not a regression from this PR. Re-run it once the baseline build has produced the clickhouse-examples artifact (or after a fresh base-branch build); no code change needed.

3. PR

Aggregate status that rolls up the workflow — it goes green automatically once DCO and Parser memory check are resolved.


Bottom line: no code fix is needed on this backport. Clear DCO with a sign-off (or remediation commit), re-run Parser memory check, and the PR gate should go green.

Evidence: result_pr.json for 554ce84, dco-2 check-run output, gh pr checks 2670.

@zvonand
zvonand merged commit b3d3206 into stable-26.8 Oct 25, 2026
286 of 290 checks passed
@zvonand zvonand added the verified Approved for release label Oct 25, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

26.8 backport Backport stable verified Approved for release

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants